Few updates on this beast!
I was able to lift all the 3/4” treated plywood up onto the stand floor and install the decking and get it screwed down.
I was also able to start on the construction of the stairs
built a 4’x4’ landing and concreted the posts in 4’ deep and put treated deck boards over the landing part just forgot to take a picture of it before I left.
I will build the stair stringers and install them over the next few weeks and add cross bracing to the whole structure and then I’m done for the year till next spring!