Well I haven’t updated this thread in a long time, mostly because of being busy, and not doing much on it over winter. I have 1 more year to have it complete before I move there, but I want it finished by the end of this summer. I have to admit, I learned a lot building it myself and my son, in the middle of the woods, a couple hundred miles from home. Several things would have been done different, maybe even hired out a few of the projects. But for the most of it, it was quality time with my son. Something I hope he looks back at when he is older and I am gone, and thinks highly of the many weekends we spent there. There are a few “mistakes” if you look close enough, but those mistakes are just marks of our learning curve.
The outside hasn’t changed much. I still need to put the facia trim on the peaks, and there is no deck up yet.
The down stairs is completed, but I don’t have any finished pictures yet, but it is all drywalled, and painted white.
The well was drilled last week, $8000 for the well? About 70 feet down he ran into a big rock, moved to a different location, and hit it again, so I have a 70 foot well, that only produces 5 gallons per minute. But we upgraded to a larger tank, and with only 2 of us there, it shouldn’t be an issue, I hope. It is a 5 inch well with a pcv pipe so rust shouldn’t be an issue. The septic guy seems to have more excuses then will to dig. So not sure when that will be done, I hope prior to July 4th. A shower, and crapping indoors is not over rated!
The upstairs has been my focus so far this spring, so the next few weekends we will be trying to get the flooring installed and finish the trim.