Been a while since I posted a thread...thought I'd share some pics of my new barn going up.
My wife and I bought our house back in 2001, and since then I have been wanting to build a nice barn/workshop out behind the house. We did a solar array on our house last fall and because of a 30% federal tax credit on that project we got a fairly large check back from this spring....so we finally decided to go for it.
A neighbor and friend of mine who owns a contracting company came in and did the site work for me...we had to remove an old 14x18 cement pad and the top soil. I then had another friend of mine who owns a landscaping company come in a drill 16 18" holes 4' down. We live on top of a mountain and have fairly rocky clay soil. The estimate was 3 days and around $1500. The crew was here for an hour and a half...cost me $200. Only one hole did we have to pull a massive boulder with my backhoe.

To set the poles in the ground I knew I did not want any wood to soil contact. I found a product call Perma-Column....they are 5' pre-cast 6x6 cement piers with an integral steel plate. I poured a cement footer in the bottom of each hole, assembled the columns to the 6x6 posts, and then brought them to the site with my forks.


I then had some friends help me set each post in the ground and backfilled with about 2 to 3' of cement and then dirt on top. Braced them up and then installed purlins and the top plate.

My wife and I bought our house back in 2001, and since then I have been wanting to build a nice barn/workshop out behind the house. We did a solar array on our house last fall and because of a 30% federal tax credit on that project we got a fairly large check back from this spring....so we finally decided to go for it.
A neighbor and friend of mine who owns a contracting company came in and did the site work for me...we had to remove an old 14x18 cement pad and the top soil. I then had another friend of mine who owns a landscaping company come in a drill 16 18" holes 4' down. We live on top of a mountain and have fairly rocky clay soil. The estimate was 3 days and around $1500. The crew was here for an hour and a half...cost me $200. Only one hole did we have to pull a massive boulder with my backhoe.

To set the poles in the ground I knew I did not want any wood to soil contact. I found a product call Perma-Column....they are 5' pre-cast 6x6 cement piers with an integral steel plate. I poured a cement footer in the bottom of each hole, assembled the columns to the 6x6 posts, and then brought them to the site with my forks.


I then had some friends help me set each post in the ground and backfilled with about 2 to 3' of cement and then dirt on top. Braced them up and then installed purlins and the top plate.